How to effectively reduce the production time of PCB proofing in PCB factory?

Today, the domestic electronic processing industry is very prosperous. As a professional PCB proofing and processing enterprise in PCB factory, the sooner the order is completed, the better. Let’s talk about how PCB factory can effectively reduce proofing time.
First of all, for PCB factories, urgent orders often occur. In order to effectively reduce the time of PCB proofing, the first thing is not to waste time on things other than proofing. For example, before proofing, carefully read PCB proofing documents and contracts to determine the requirements of the whole proofing, then prepare the required materials in advance and arrange proofing personnel. If two shifts are required, arrange attendance and shifts to ensure that all preparations except technical ones are completed.
  Second, the PCB proofing plan should be more standardized. Usually, the proofing time of PCB circuit board is five days to half a month. The reason for the time difference is that the design scheme is not standardized in design, which makes PCB manufacturers detour in production. Therefore, the design scheme should be standardized, such as how many cooling holes should be reserved for the circuit board, such as where is the marking position of screen printing? It may only be a parameter written in the design plan, but it can effectively reduce PCB proofing time.
Thirdly, it is also important to control the quantity of PCB proofing. If the planned quantity is too large at the beginning, it will increase the cost, but try to do as much as possible during PCB proofing, because the board may burn during the performance test.
The above points are ways to shorten PCB proofing time. In addition, the efficiency of PCB proofing is also related to technical experience and other factors. Therefore, as a processing enterprise, it should be technically improved.